Kerala Pwd Price 3 __exclusive__ »
Workflow Integration
: It manages the entire lifecycle of an estimate, from initial proposal and Detailed Project Report (DPR) creation to Technical Sanction (TS) and Administrative Sanction (AS).
One afternoon, a local official visited the site. "Madhavan, the villagers want the culvert widened. It’s not in the original Price 3 estimate, but it’s needed." kerala pwd price 3
- Item: "Plain cement concrete 1:2:4 (PCC) 100 mm thick"
- KSITE (Kerala State Information Technology Infrastructure) portal
- PWD e-Tendering Suite (under the "Schedule" tab)
- Mobile app: "Kerala PWD SOR" – unofficial but widely used third-party apps (use with caution; verify data with official PDF)
- Go to Publications → Schedule of Rates.
- Download the latest BSR for Civil Works.
- Look for the column named "Rate for Price Level 3" or "Rate – P3".
- Cross-reference with the item code of interest (e.g., ITEM 11.3.2 for RCC works).
If you have a specific file, PDF, or dataset containing the numbers for "Price 3" that you would like analyzed (e.g., "Calculate the total cost for 500 sqm of plastering using Price 3"), please upload the file or paste the specific data points for a detailed numerical report. Workflow Integration : It manages the entire lifecycle
- Price 1: This is usually the base rate (often roughly equivalent to the SOR publish rate or slightly below/above). It is typically applied to standard works in accessible areas where material transportation and labor availability are not difficult.
- Price 2: This is an intermediate rate (often a percentage increase over Price 1). It is used for works that are somewhat remote or where market rates are higher than the base SOR.
- Price 3: This is the highest rate among the standard categories.